A Risk Management Approach to The Development of an Early Warning System: A Case for Tasik Chini

Siti Narimah Jamali, Mohamad Shanudin Zakaria, Siti Nabila Jamali

Abstract


IT Risk Management is the application of risk management methods to information technology in order to manage IT risk. The business risk associated with the use, ownership, operation, involvement, influence and adoption of IT within an enterprise or organization. The purpose of this paper is to overcome the issue in implementing the IT Risk Management at Tasik Chini Research Centre (PPTC), Universiti Kebangsaan Malaysia. This paper aimed to enhance the risk management awareness by promoting active involvement of the workers in the daily affairs and the decision-making process. This paper used both quantitative and qualitative methods. Data was collected by interviewing the community living at the edge of the lake as well as collecting on-site at the rivers’s monitoring station. The negative feedback include no framework of IT risk management at PPTC, lack of understanding in IT risk management concept among the PPTC staffs, and the need to promote a few aspects of the risk management policy, for instance, by introducing the development of risk management system or a customized model to register risk and data collection. The positive side was not limited to IT solely. They include the interest shown by PPTC top managements in implementing the full IT risk management in order to achieve the objectives of research centre. The results were also used in the development of the early warning system in water quality prototype as an early warning to the PPTC staffs and Orang Asli living in the vicinity of Tasik Chini. The study began by identifying the problems faced by the PPTC staffs to the usability of the risk management system that are available from the interviews. Usability characteristics of risk management system and early warning system that are suitable to the PPTC staffs and Orang Asli are identified and a guideline for the users interface usability of information systems is constructed.

Keywords


risk management; water quality; research centre; usability; early warning system

Full Text:

PDF

References


Abdul Aziz, I., Ismail, M. J., Samiha Haron, N. & Mehat, M. 2008. Remote Monitoring using Sensor in Greenhouse Agriculture. 2008 International Symposium on Information Technology 4: 1–8. doi:10.1109/ITSIM.2008.4631923.

Alali, B. 2010. Post-Project Risk Perception and Systems Management Reaction. Norfolk, Virginia. Old Dominion University.

Amaldi, P. & Chellappah, A. 2012. The Integration of Alarm Device into Socio-Technical Systems: The Case of an Onboard Alert Device (ACAS). (July): 1-7.

Anon. 2016. Majalah Kualiti Air & Eko-Hidrologi. Pusat Penyelidikan Tasik Chini, Fakulti Sains dan Teknologi. Pekan, Pahang. Penerbit UKM. 15 Oktober: 3-7.

AS/NZS ISO 31000. 2009. Risk Management - Principles and Guidelines (February): 108–116. doi:10.1007/b138437.

Aven, T. & Vinnem, J. E. 2007. Risk Management with Applications from the Offshore Petroleum Industry. (H. Pham, Ed.). Springer Series in Reliability Engineering 1-20.

Baird, A. & Riggins, F. J. 2012. Planning and Sprinting: Use of a Hybrid Project Management Methodology within a Cis Capstone Course. Journal of Information Systems Education 23(3): 243–257. doi:10.1002/spip.

Dohn, K., Zoleński, W. & Gumiński, A. 2014. Early Warning Concept in Identifying Risks in Business Activity 149–187. doi:10.1007/978-3-319-30877-7.

Ebrahimpour, M. & Mushrifah, I. 2008. Heavy Metal Concentrations in Water and Sediments in Tasik Chini, a Freshwater Lake, Malaysia. Environmental Monitoring and Assessment 141(1–3): 297–307. doi:10.1007/s10661-007-9896-7.

Ernawati, T., Suhardi & Nugroho, D. R. 2012. IT Risk Management Framework based on ISO 31000:2009. 2012 International Conference on System Engineering and Technology (ICSET), 1–8. doi:10.1109/ICSEngT.2012.6339352.

Frolov, a. V., Asmus, V. V., Borshch, S. V., Vil’fand, R. M., Zhabina, I. I., Zatyagalova, V. V., Krovotyntsev, V. a., et al. 2016. GIS-Amur System of Flood Monitoring, Forecasting, and Early Warning. Russian Meteorology and Hydrology 41(3): 157–169. doi:10.3103/S1068373916030018.

Habibah, A., Mushrifah, I., Hamzah, J., Toriman, M. E., Buang, A., Jusoff, K., Fuad, M. J. M., et al. 2012. Assessing Natural Capitals for Sustainable Ecotourism in Tasik Chini Biosphere. Advances in Natural and Applied Sciences 6(1): 1–9. doi:1995-0772.

Hassen, S. S. & Zakaria, M. S. 2013. Managing University IT Risks in Structured and Organized Environment. Research Journal of Applied Sciences, Engineering and Technology 6(12): 2270–2276.

Hommel, U., Li, W. & Pastwa, A. M. 2016. The State of Risk Management in Business Schools. Journal of Management Development 35(5): 606–622. doi:10.1108/JMD-08-2014-0088.

Hou, D., Song, X., Zhang, G., Zhang, H. & Loaiciga, H. 2013. An Early Warning and Control System for Urban, Drinking Water Quality Protection: China’s Experience. Environmental science and pollution research international 20(7): 4496–508. doi:10.1007/s11356-012-1406-y.

Idris, A., Basari, A. S. H. & Zubir, N. H. 2009. An Application of SMS Technology for Customer Service Centre. SoCPaR 2009 - Soft Computing and Pattern Recognition 633–636. doi:10.1109/SoCPaR.2009.124.

Insua, D. R., Alfaro, C., Gomez, J., Hernandez-Coronado, P. & Bernal, F. 2016. A Framework for Risk Management Decisions in Aviation Safety at State Level. Reliability Engineering and System Safety 1-31. doi:10.1016/j.ress.2016.12.002.

ISO 31000. 2009. A Structured Approach to Enterprise Risk Management (ERM) and the Requirements of ISO 31000. Risk Management 7(1): 20. doi:10.1016/j.solmat.2010.12.013.

Lehtiranta, L. & Junnonen, J.-M. 2014. Stretching Risk Management Standards: Multi-Organizational Perspectives. Built Environment Project and Asset Management 4(2): 128–145. doi:10.1108/BEPAM-06-2013-0019.

Lin-zi, L., Yu, Q. & Yu-chao, Z. 2010. Developing Water Pollution Accident Emergency Warning System for Chu River Downstream Basin 1-6.

Ozturk, U., Tarakegn, Y. A., Longoni, L., Brambilla, D., Papini, M. & Jensen, J. 2015. A Simplified Early-Warning System for Imminent Landslide Prediction based on Failure Index Fragility Curves Developed through Numerical Analysis. Geomatics, Natural Hazards and Risk 5705(August): 1–20. doi:10.1080/19475705.2015.1058863.

Reim, W., Parida, V. & Sjödin, D. R. 2016. Risk Management for Product-Service System Operation. International Journal of Operations & Production Management 36(6): 665–686. doi:10.1108/IJOPM-10-2014-0498.

Shuhaimi-Othman, M., Lim, E. C. & Mushrifah, I. 2007. Water Quality Changes in Chini Lake, Pahang, West Malaysia. Environmental Monitoring and Assessment 131(1–3): 279–292. doi:10.1007/s10661-006-9475-3.

Simmons, T. 2016. A Qualitative Examination of the Perception of Risk in Warnings for Severe Weather. PhD thesis, Walden University.

Tiranti, D. & Rabuffetti, D. 2010. Estimation of Rainfall Thresholds Triggering Shallow Landslides for an Operational Warning System Implementation (January 2009): 471–481. doi:10.1007/s10346-010-0198-8.

Yun-hong, H., Wen-bo, L. & Xiu-ling, X. 2007. An Early Warning System for Technological Innovation Risk Management using Artificial Neural Networks 2128–2133.

Zhang, X. ju, Qiu, N., Zhao, W. R., An, H. & Tommy, J. L. 2014. Water Environment Early Warning Index System in Tongzhou District. Natural Hazards 75(3): 2699–2714. doi:10.1007/s11069-014-1456-1.


Refbacks

  • There are currently no refbacks.


e-ISSN : 2289-2192

For any inquiry regarding our journal please contact our editorial board by email apjitm@ukm.edu.my